Case Study - Trend

Trend Case Study English Thumbnail
Reduce your production time!

Trend Technologies were manufacturing two panels in high quantities: a front panel with 170 M6 and 79 M4 threads, and a rear panel with 170 M6 threads. We reviewed the drawings and suggested the use of two QuickTaps would improve operational efficiency. As a result, Trend Technologies ordered two QuickTap tools, and the production times were significantly reduced – in fact a 50% reduction!